In 2018, an investment was made to enlarge the production facility. We moved to a new factory building with a closed area of 4200 m² in Istanbul Gaziosmanpaşa. Our facilities in two separate locations were gathered under the roof of one building. Thanks to the facilitation of logistics and the growth of the area, an increase in production capacity was achieved.